Organizing your crew
1. Should you hire traffic control, or do it yourself?
2. Why should I consider purchasing the Mr. Manhole cutter?
3. Can we cut manholes at night to minimize traffic diruptions?
4. How should the work flow for a five man crew be organized?
5. How many manhole repairs can a five man crew do per day?
6. Do we need training to operate the Mr. Manhole tools beyond what the demonstration will provide?
7. What equipment is required for a five man crew doing manhole rebuilds the Mr. Manhole method?
8. How many manholes can a five man crew remove and rebuild in an eight hour day?
9. I'm bidding a large manhole frame adjustment project that specifies the Mr. Manhole method. What should I look for when doing a preliminary inspection of the job site?
10. How can an operator minimize damage to the cutting teeth when encountering steel reinforcing during a cut?