How many manhole repairs can a five man crew do per day?

Was this article helpful? Vote!
No votes
After a crew gains just a little experience it should be very easy to remove and rebuild ten manhole chimneys in a day. The flow of operation is that typically five men make up a crew. One man is the operator and he works by himself. Two men form the cleanup detail, while the remaining two men do the actual rebuilding.

Resource Link: https://mrmanhole.com/platinum-six-shooter/
Additional Link: https://www.youtube.com/watch?v=yV1yJwhkG3M&t=46s

Related Articles

Frost Heave in Colder Climates

Perfect to Remove Manhole Frames in Any Climate The Mr. Manhole tool system is the best method in any climate, to remove manhole frames and the surrounding road surface. The question of frost heave ar

Why use a Mr. Manhole Cutter for Repairs?

The answer is simple: faster repairs, cheaper labor, and happier workers! The Mr. Manhole system is a state-of-the-art set of tools and repair system that allows your crew to quickly and easily cut ou

Why Mr. Manhole is Perfect for Contractors

It is vital that you choose the appropriate technique to rehab a manhole to extend its life, and also to ensure cost efficiency. You need a method that will provide a long-term solution to the problem

Mr. Manhole allows you to work year round

Above is a normal everyday photo of a road contractor and crew taking care of a manhole, well, except it’s not exactly normal. If you notice there is snow accumulation and probably a little ice on t

Comments